Skip to content
Customize

9 free starting plans

Pole shed plans

A pole shed is a pole barn built to keep tractors, implements and other equipment, or hay, firewood and a trailer, out of the weather, often with a side left open. 9 free plans: 12x16, 16x24, 20x20, 24x24, 24x32, 30x40, 30x50, 40x60 and 40x80. Open fronts, open carports, lean-tos and big equipment sheds, drawn and priced by the barn designer.

A red pole shed with the front open on a tractor and round hay bales, a charcoal steel roof on wood postsIllustration
Plans
9
Floor, sq ft
192 to 3,200
Materials, about
$4,500 to $39,000
Preliminary checks
All passed at 30 psf

Every size, drawn by the designer

Pick a pole shed size.

Each one is a full starting plan: framed, checked for 30 psf of ground snow, 115 mph of wind and a 36 in frost line, and priced. Switch the view to see the frame or the dimensions.

The 16x24 open-front pole shed, one of the pole shed plans, drawn by the designerThe 16x24 open-front pole shed, one of the pole shed plans, framing view, drawn by the designerThe 16x24 open-front pole shed, one of the pole shed plans, dimensions view, drawn by the designerDrawn by the designer from this plan

16x24

16x24 open-front pole shed

A pole shed with three closed walls and the front open, for a tractor, a trailer or a hay stack. Three 8 ft bays on an 8 ft eave.

Floor
384 sq ft
Eave
8'
Front
Open
Posts
9, 6x6
Trusses
4 at 8', 16' span
Bays
3 of 8'

Preliminary checks passed for the loads you entered. Local approval not checked. 4 items for your builder or engineer: window jack studs on the girts, post foundation in uplift, post tops dry when bolted, diaphragm, shear walls and post embedment.

Materials about $7,000, before tax and delivery

What it needs

What a pole shed has to clear.

Which side stays open, how big the machine is and what the permit says. The charts give each plan's side of the comparison.

  1. 01Open sides

    Pick the side that stays open.

    Two of these plans leave the front open, two are carports open on all four sides, and two add an open lean-to along a long wall. In the designer every wall is open or closed on its own, and the frame follows: posts next to an open side go 24 in deeper, an open long side gets a knee brace at every post, and a carport gets both on every side.

    An open side also takes away the wall that braces the building in that direction. The designer lists the roof diaphragm and the shear walls as an item for your builder or engineer instead of passing them.

  2. 02Equipment

    Size the tractor shed to the machine, then the door.

    The stores we read list overhead doors up to 12 x 14 ft, and 16 ft wide only up to 7 ft tall. The 40x80 has a 12' x 10' door on a 12' eave. A tractor with a cab or a loader raised, a round baler or a combine can be taller or wider than that, so measure the tallest and the widest with whatever rides on it, and compare it with the door, not the building.

    Measure the machine's height with the ROPS or the cab up, and its width with the mirrors out. We do not publish machine dimensions, because models and attachments differ too much; your own tape is the number that counts. On an open-front plan the clear height under the front is the eave of the plan you choose, 8' on the 16x24, shown in each plan's spec above.

    Under a carport roof the limit is the clear height under the eave: 9' on the carports here, and an RV needs about 14 ft. A big door also needs 16 in above the opening for its track and spring.

  3. 03Snow and wind

    No checked part past 95% of its limit.

    As drawn, each plan is checked for 30 psf of ground snow, 115 mph of wind and a 36 in frost line. The bar is the most any checked member or connection on that plan uses of its limit, and every one stays at 95% or less; past that, the designer moves the purlins closer or goes up a size. The highest here is the 30x50: truss-to-post bolts, wind uplift, 6 x 1/2 in through-bolts, 95%.

    In the designer you enter your own loads, 20 to 70 psf of snow and 105 to 140 mph of wind. Past 30 psf the truss maker designs the trusses for your load; past 115 mph the posts, bracing and uplift need a second look. These are preliminary checks for the loads you entered; local approval is not checked, so ask your building department what it needs.

  4. 04Permit

    The 200 sq ft line is where the conversation starts.

    The model International Residential Code, section R105.2 in the 2021 edition, exempts one-story detached accessory structures from a building permit when the floor area is 200 sq ft or less (Grant County, Washington, reprinting IRC 2021 R105). In this group the 12x16 (192 sq ft) is under it; every other plan is over.

    States and towns adopt the code with their own changes: California's residential code sets the limit at 120 sq ft, and a city such as Elgin, Illinois, asks for a permit before work starts on any shed. The exemption covers the building permit only. Zoning rules such as setbacks, height limits and easements usually apply at any size, and electrical work needs its own permit. A farm building may be treated differently from a garage, so ask your building department what applies to a pole building, with the size and the post layout in hand. Our plans run preliminary checks for the loads you enter; local approval is not checked.

Side by side

Common pole shed sizes compared.

6 of the 9 plans, from the smallest to the largest. Show all 9 for every size in between.

PlanFloorEaveVehicle doorPostsTrussesMaterials, aboutLabor if hired, broad referenceBuild timeChecks
The 12x16 open-front pole shed plan, one of the pole shed plans, drawn by the barn designer12x1612x16 open-front pole shed192 sq ft8'Open front73 at 8'$4,700$960 to $2,88045 to 65 hPassed, 4 for your builder
The 16x24 open-front pole shed plan, one of the pole shed plans, drawn by the barn designer16x2416x24 open-front pole shed384 sq ft8'Open front94 at 8'$7,000$1,920 to $5,76065 to 90 hPassed, 4 for your builder
The 20x20 carport plan, one of the pole shed plans, drawn by the barn designer20x2020x20 carport400 sq ft9'9' clear, open sides63 at 10'$4,500$2,000 to $6,00040 to 60 hPassed, 4 for your builder
The 24x24 carport plan, one of the pole shed plans, drawn by the barn designer24x2424x24 carport576 sq ft9'9' clear, open sides84 at 8'$6,000$2,880 to $8,64050 to 75 hPassed, 4 for your builder
The 24x32 pole barn plan, one of the pole shed plans, drawn by the barn designer24x3224x32 pole barn768 sq ft12'8' x 8' overhead195 at 8'$17,100$3,840 to $11,520135 to 195 hPassed, 7 for your builder
The 30x40 pole barn plan, one of the pole shed plans, drawn by the barn designer30x4030x40 pole barn1,200 sq ft12'10' x 8' overhead256 at 8'$21,800$6,000 to $18,000170 to 250 hPassed, 7 for your builder
The 30x50 pole barn plan, one of the pole shed plans, drawn by the barn designer30x5030x50 pole barn1,500 sq ft10'10' x 8' overhead196 at 10'$21,300$7,500 to $22,500170 to 255 hPassed, 5 for your builder
The 40x60 pole barn plan, one of the pole shed plans, drawn by the barn designer40x6040x60 pole barn2,400 sq ft12'12' x 10' overhead3011 at 6'$31,600$12,000 to $36,000255 to 375 hPassed, 4 for your builder
The 40x80 pole barn plan, one of the pole shed plans, drawn by the barn designer40x8040x80 pole barn3,200 sq ft12'12' x 10' overhead3011 at 8'$39,000$16,000 to $48,000290 to 425 hPassed, 5 for your builder

Each row is the starting plan as drawn, for 30 psf of ground snow, 115 mph of wind and a 36 in frost line. Materials are rounded: shelf prices plus the estimated trusses and concrete, before sales tax, delivery, labor and site work. Each plan page keeps the shelf prices, the estimate and the exact sum apart. Labor is the published range for hiring it out, a broad reference and not a quote; build time is total labor hours. Passed means the preliminary checks passed for those loads; local approval is not checked.

What they cost

About $4,500 to $39,000 in materials.

Each plan's materials list, priced line by line: shelf prices plus the trusses and the concrete or gravel estimated from published ranges. Hired labor is apart and only a broad reference from published price guides, not a quote; the table above has it plan by plan.

Lowest
$4,500, 20x20
Highest
$39,000, 40x80
Per sq ft of floor
$10.38 to $24.52
Labor if hired, broad reference
$960 to $48,000

Excluded: sales tax, delivery, permits, site work, engineering and equipment rental

The pole barn cost guide breaks it down by group, and the pole barn cost calculator runs the same numbers for your own size.

Materials for each pole shed plan

The $79 builder's plan

Free to plan. $79 to build from.

Every plan above is free to open, check and price. The builder's plan is drawn from the barn you finish, for one payment. These are real sheets from the 39-sheet plan for the 30x40 pole barn.

Free

  • The design in 3D, and every change you make to it
  • Every preliminary check, with its rule and its source
  • The materials list priced line by line
  • A summary PDF of the design and its checks

$79 once

  • The post layout, every post dimensioned from one corner
  • Every wall framed: girts, headers and openings with heights
  • The truss order sheet to hand the truss maker
  • The roof frame and the steel, panel by panel
  • The cut list, the shopping list with store prices and the build, step by step
Customize the 16x24, free

You check out in the designer, with your design loaded. If the plan has an error, we fix it or refund you within 30 days. Guarantee terms.

Real sheets from the 39-sheet sample plan for the 30x40 pole barn

  • Sample sheet 1 of 39 from the plan for the 30x40 pole barn in our pole shed plans: post layout

    01Post layout

  • Sample sheet 2 of 39 from the plan for the 30x40 pole barn in our pole shed plans: wall framing

    02Wall framing

  • Sample sheet 5 of 39 from the plan for the 30x40 pole barn in our pole shed plans: truss order sheet

    05Truss order sheet

  • Sample sheet 4 of 39 from the plan for the 30x40 pole barn in our pole shed plans: shopping list

    04Shopping list

Sample sheets from the plan for the 30x40 pole barn in our pole shed plans

Questions

Anything else? Write to us or read the questions about all plans.

Questions about pole shed plans

Yes. All 9 pole shed plans on this page are free: each comes with the 3D design, the post and truss counts and a priced materials list, and you can open any of them in the designer to change the size, the eave or which side stays open. For a machine shed, start from the 16x24 open-front pole shed or the big 40x80 pole barn and set the door to your tallest machine.

Measure the tractor with the ROPS or cab up for height and with the mirrors out for width, with whatever implement rides on it. Add room to walk around it on each side, then pick the plan whose open width and eave clear that machine with margin. The 16x24 open-front pole shed has an open front and a 8' eave; if your machine does not clear that, raise the eave in the designer or take a larger plan.

Mostly the frame and the size. A pole barn sets treated posts in the ground and puts a truss on each pair, so the walls and the roof hang on the posts; a shed usually sits on skids or a floor frame and uses studs. The word pole shed is used for a small or open pole barn: our 16x24 open-front pole shed is 9 posts and 4 trusses. Same designer, same checks, a smaller bill of materials.

Yes, with help for the heavy lifts. The 16x24 open-front pole shed comes to about 65 to 90 labor hours, roughly 4 to 6 working days for a crew of two. The trusses come from a truss maker, and the posts need a hole digger or an auger. The how-to guide gives the steps in order.

The materials for our 20x20 pole barn come to about $10,900, before sales tax, delivery, labor and site work: $7,967.68 at shelf prices plus $2,919.00 for the trusses and the slab, estimated from published ranges, exact sum $10,886.68. The open 20x20 carport, with no walls and a gravel floor, comes to about $4,500. Across the 9 pole shed plans here the materials run from $4,500 to $39,000.

It depends on where you build and on the size. The model code exempts one-story detached accessory structures of 200 sq ft or less from a building permit, many towns set a lower limit, and a farm building may be exempt where a garage is not. Setbacks and height limits apply at any size. Ask your building department before you dig; our plans run preliminary checks for the loads you enter, and local approval is not checked. Our pole barn permit guide shows how four counties write their farm exemptions and what to bring to the counter.

Your zoning sets it, and it differs by town, district and building type, so there is no single number. Ask your planning or zoning office for the setback to the side and rear lines, the distance to the house and any height limit, and check for easements before you place the posts. The designer does not know your lot lines, so measure from the survey, not from the plan.

Other ways to browse

Not quite the barn you picture?

Your loads, your barn

Start from the 16x24. Make it yours.

Change the width, the length, the bays, the eave, the doors and your loads. The post size and depth, the purlins, the headers and the materials list follow every change. Free, no account.

Customize this design, free
Designing
Free
Builder's plan
$79 once
Account
Not needed
Inside a new building like the 16x24 in these pole shed plans: trusses, girts and a workbench, the overhead door open on a fieldIllustration