Skip to content
Design free

Permits and rules

Pole Barn Permit: What the Code Says and What to Bring

Size, use and location decide whether a pole barn needs a permit, and your county has the last word. Here is the model code line, how farm exemptions are written in the handouts we read, and the papers to bring.

By The Barn PlannerUpdated 9 min readChecked against 7 sources

Pole barn permit: construction plans on a truck tailgate next to survey stakes marking the corners of a pole barn padIllustration

The short answer

Most pole barns need a permit, and only your building department can say for sure. The model residential code exempts a one-story detached accessory structure up to 200 sq ft, farm buildings may be exempt in some counties, and zoning applies either way. Our designer draws the plan set you bring.

Most pole barns need a permit. Whether yours does depends on three things: how big it is, what you will use it for, and where it stands. The first two you control. The third belongs to your county, city or township, and its rules can differ from the next county’s.

We will not tell you what your county requires, because we cannot know it from here. What we can do is show what the model code says, how the exemptions are written in the handouts we read, and what to bring to the counter. Our barn designer draws the plan set you bring, with the posts, trusses and bays laid out.

The 200 Sq Ft Line in the Model Code

Section R105.1 of the 2021 International Residential Code (IRC) says that an owner who intends to construct, enlarge, alter, repair, move or demolish a building or structure, or to change its occupancy, must first apply to the building official and obtain the required permit. The model code starts from “permit required.”

Section R105.2 then lists work that does not need one. The first item is one-story detached accessory structures, other than storm shelters, provided the floor area does not exceed 200 square feet (reprint of IRC 2021 R105.2, Grant County, Washington). The same section adds a sentence that matters more than the number: an exemption from permit requirements does not grant authorization for any work done in violation of the code or other local laws.

What the Line Is, and What It Is Not

It is the model code, which a state, county or city adopts and may change. It applies to a detached accessory structure of one story, which a small pole shed can be. It does not describe a 30x40 shop, a barn with a loft or anything that is attached to a house. Those sit well above 200 sq ft, so the exemption is not where a real pole barn lands.

Local Offices Move the Line

A local office is free to set a different threshold or none. Elgin, Illinois publishes a one-page guide for sheds that asks for a quick permit application, a fee, a plat of survey or site plan with the setbacks and elevations of the shed, and says no work can begin before a permit is issued. It defines a shed as an accessory structure no larger than 150 square feet (City of Elgin, Quick Guide: Shed). Treat the 200 as a starting point to compare against, not a promise.

Farm Buildings and the Agricultural Exemption

Many places treat a real farm building differently. The National Frame Building Association1 (NFBA) writes in its argument for engineered post-frame buildings that “codes exempt agricultural buildings,” and that is exactly why it urges owners to have them engineered anyway: an exempt building still sees the same snow and wind (NFBA, D. Bohnhoff, “An Argument for Fully Engineered Post-Frame Buildings”). Exempt from the permit does not mean exempt from the weather.

The exemptions are written locally, and no two read alike. Four handouts we opened show the pattern. We cite them as examples only. None of them is your county.

Clark County, Washington

Clark County’s2 page on its agricultural structure permit exemption lists conditions: the owner certifies that the sole use is agricultural, tells the county before any change in use, tells a buyer about the exempt status, and shows all structures and their uses on the site plan. It states that the exemption is not an exemption from setback requirements or environmental regulations, that plumbing and mechanical permits are still required, and that it does not cover residential accessory structures, shop structures or garages (Clark County, Washington).

Sherburne County, Minnesota

Sherburne County’s handout points to a state statute, Minn. Stat. 326B.103, for the definition: a structure on agricultural land, designed, constructed and used to house farm implements, livestock or agricultural products, and used only by the owner, lessee and their families, employees and people delivering agricultural products. The whole building must be agricultural: the handout says you cannot store non-farm equipment in a part of it. Electrical work still needs a permit under the state electric code, and a septic permit is required if plumbing is installed (Sherburne County, Agriculture Building Permit Exemption Handout).

Sacramento County, California

Sacramento County’s GI-22 offers an agricultural exempt permit for buildings on a parcel of at least 20 acres or zoned AG-20, limited to housing farm implements, hay, grain, poultry, livestock or horticultural products. Such a building cannot be a place for human habitation, a place of employment where products are processed, or a place used by the public. It also says exempt buildings are still subject to setbacks, to other county departments, and to a flood zone check (Sacramento County, GI-22, last update 8/2024). Note the word “permit”: here the exemption is itself a light permit, with a fee and inspections.

El Paso County, Colorado

El Paso County’s quick tips go the furthest. It exempts structures used solely for agricultural purposes from the building code except for electrical, plumbing and mechanical requirements, and it says “pole barns” are not automatically exempt and all structures require a building permit unless explicitly exempt. Personal or vehicle storage and commercial uses are not agricultural, and the exemption needs an application, a site plan and a notarized affidavit recorded with the county clerk (El Paso County Planning and Community Development).

What the Four Have in Common

Read together, they agree on more than they differ. The use must be solely agricultural. Zoning, setbacks, electrical, plumbing and mechanical stay in play. A change of use ends the exemption. If you plan a hobby shop, a vehicle garage or a party barn, assume it is not a farm building, whatever the label on your plan says.

Zoning Still Applies

A permit exemption, where it exists, is a building code question. Zoning is a different office with different rules, and it answers questions the building code does not: how close to the property line, how tall, how many accessory buildings, how large compared with the house, and where easements run.

Clark County2 says its exemption is not an exemption from setbacks. Elgin says all shed projects are subject to zoning approval and must stay out of easement areas. Sacramento’s handout says the Planning Department must approve the distances between structures and property lines. Subdivisions can add covenants: Elgin notes that many have private covenants which supersede city zoning, and the city does not enforce them, so check with the homeowners association.

Electrical is separate again. All four handouts leave at least one of electrical, plumbing or mechanical outside the farm exemption. If you wire the barn, plan on its own permit and its own inspection.

What the Building Department Asks For

Ask for the submittal checklist before you draw anything. The two checklists we read agree on the core. Elgin asks for the application, the fee, a plat of survey or site plan showing the locations, dimensions and setbacks of all existing and proposed improvements, and elevations of the shed. Sacramento asks for a detailed plot plan with the distances between structures and property lines and the location of utilities, wells and septic systems, a roof plan, an elevation plan of all four sides and a floor plan, and says that larger buildings can need an engineer.

The Plan Set

This is where our plan helps. The designer draws the layout, the posts and the trusses to the size you choose, with a plan set for the building you design. A permit office may also ask for details our drawing does not replace, so ask what it wants stamped. For how the plans compare with a kit, see kit vs plans: neither one is a permit, and neither one replaces the review by your building department.

Truss Drawings and Loads

Ask whether the office wants drawings for the roof trusses. The loads they must resist come from your county: ground snow load, design wind speed and frost depth. Ask the office for those three numbers when you ask for the checklist. Our truss spacing guide explains how spacing and post spacing tie together.

A Site Plan You Can Draw Yourself

A site plan is a top view of the lot. Draw the property lines, the house, the well and septic area, the easements and the barn, with the distances in feet. Measure from the survey if you have one, and mark every distance Elgin and Sacramento ask for.

Turning a Pole Barn Into a Home

Residential use changes the rules, not just the paperwork. The handouts above bar human habitation from the farm exemption, and Sherburne’s handout says that using the building for something else means changing its occupancy, getting the required permits and bringing the building into compliance with the current code. Sacramento’s GI-22 gives an example from the other direction: a hay barn cannot later be a commercial riding stable without a permit for change of use. Sherburne adds that if you expect a change of use, going through the building permit process now is easier and likely less expensive.

The cheapest time to decide is before the posts go in. If a home or a loft apartment is possible later, tell the office when you apply, and read our guide to a pole barn with living quarters before you pick the foundation, the floor and the wall height. For a shop that stays a shop, start with our pole shed plans or the pole barn garage plans.

Depends on where you build

Your county decides

Whether a pole barn needs a permit, what a farm exemption requires and what the fee is all come from your county, city or township. Check with your local building department, and with the zoning office, before you buy materials.

If you plan to build it yourself, our guide to how to build a pole barn covers the order of work and the permit questions to ask first.

Sources

Every number in this guide that does not come from our own barn designer was checked against these 7 documents, numbered in the order the text first cites them and read on Oct 29, 2026. 7 are county guides, handbooks and makers.

  1. 1National Frame Building AssociationAn Argument for Fully Engineered Post-Frame Buildings, D. Bohnhoff
  2. 2Clark County, WashingtonAgricultural structure permit exemption
  3. 3City of Elgin, IllinoisQuick Guide: Shed
  4. 4El Paso County, Colorado, Planning and Community DevelopmentPCD Quick Tips: Agricultural Structure Exemption from the Building Code
  5. 5Grant County, WashingtonExempt R105.2 (2021 International Residential Code, section R105) (Apr 5, 2024)
  6. 6Sacramento County, CaliforniaGI-22 Agricultural Exempt Building Permits (last update 8/2024)
  7. 7Sherburne County, MinnesotaAgriculture Building Permit Exemption Handout

Questions

Anything else? Write to us or browse every guide.

Questions people ask

There is no national number. Building departments set their own fees, and many tie them to the value or the size of the building. As one example, Sacramento County's agricultural exempt permit is billed in inspector hours, not a flat price: 2 hours for a structure over 200 and up to 500 sq ft, 2.5 hours from 501 to 5,000 sq ft, and 5 hours from 5,001 to 10,000 sq ft, at the county's current billing rate (Sacramento County, GI-22, last update 8/2024). Your county's fee schedule is the only number that counts, and the permit office can quote it from your plan.

Often yes, as the owner, but the permit and the inspections still apply. Sacramento County says that if you want to build your own wood building under its conventional light frame rules, you can draw your own plans as long as they are to scale and dimensioned (Sacramento County, GI-22). Other offices want more. Ask yours who may pull the permit, and read our guide to building one step by step.

In the 2021 International Residential Code, section R105.2, permits are not required for one-story detached accessory structures if the floor area does not exceed 200 sq ft (reprint by Grant County, Washington). That is the model code, and a local office can set it lower or add conditions. Elgin, Illinois, for one, asks for a permit for a shed, which it defines as an accessory structure no larger than 150 sq ft (City of Elgin, Quick Guide: Shed). Check your own limit before you pick a size.

The result depends on where you live, so ask your building department. Sacramento County's handout notes that its reduced agricultural fees do not apply to structures built without permits or in violation of state or county rules (Sacramento County, GI-22), and Elgin says no work can begin before a permit is issued (City of Elgin). Stop-work orders, fines, a demand to remove or legalize the building, and trouble with insurance or a sale are the usual worries, but each office decides its own.

Often yes, because enclosing changes the building. Sacramento County describes its pole barn exception for open buildings: unless designed, they are open on at least three sides, or light frame siding covers no more than 50% of the open area on any side (Sacramento County, GI-22). Closing in walls, adding a bathroom, heat or lights also brings the electrical, plumbing or mechanical rules into play. Ask before you buy siding.

Yes, as a residence permitted and inspected as one, not as a barn with a bed in it. The farm handouts we read are plain that an exempt agricultural building cannot be a place of human habitation (Clark County, Washington; Sacramento County). Turning a barn into a home is a change of use, and the building then has to meet the residential code. Our guide to pole barns with living quarters covers the design side.

Design it, then build it

Size it for your loads before you buy a post.

Draw your barn in 3D for your snow, wind and frost line. The posts, the trusses, the purlins and the priced materials list follow every change. Free, no account.

Design my barn, free
Designing
Free
Builder's plan
$79 once
Account
Not needed
Inside a new pole barn built the way our pole barn permit guide describes: trusses, girts and a workbench, the overhead door open on a fieldIllustration